Green Line = Main 1
Red Line = Main 2
815
G815
40-30
Evanston Sub Limits
816.70
40-30
816.9
G817
40-30
Crossover
817.10
40-30
817.2
G817
40-30
Crossover
817.49
40-30
818.2
40-30 ⇑
60-50 ⇓
819.3
60-50
819.3
60-50
Dragging Equipment. Talk on defect only.
821.3
60-50
Dragging Equipment. Talk on defect only.
822
60-50
Wheel Impact. Talk on defect only.
823.1
60-50
Dragging Equipment. Talk on defect only.
823.6
60-50 ⇑
65-60 ⇓
824.79
65-60
824.8
G825
65-60
Crossover
825
G825
65-60
Crossover
825.3
65-60
825.53
65-60
827.1
60-50
Dragging Equipment. Talk on defect only.
827.4
60-50
Hot Box & Dragging Equipment. Talk on defect only.
827.4
65-60 ⇑
79-70 ⇓
828.5
79-70
Dragging Equipment. Talk on defect only.
830.04
79-70
830.1
79-70
830.1
79-70
Dragging Equipment. Talk on defect only.
830.7
79-70
Industrial Lead
831.8
79-70
Dragging Equipment. Talk on defect only.
833.2
G833
79-70
Crossover
833.3
G833
79-70
Crossover
833.6
79-70 ⇑
70-60 ⇓
834.1
70-60 ⇑
79-70 ⇓
Industrial Lead
834.7
79-70
834.9
79-70
Industrial Lead
834.9
79-70
Dragging Equipment. Talk on defect only.
834.92
79-70
837.3
79-70
Industrial Lead
837.6
79-70
Wheel Impact. Talk on defect only.
839.1
79-70
Industrial Lead
839.23
79-70
840.83
79-70
842.5
79-70
Industrial Lead
843.9
G844
79-70
Crossover. Siding length 13,456'
843.9
79-70
Hot Box & Dragging Equipment. Talking detector.
844
G844
/
79-70
Siding length: 13,456'
844.8
|
|
79-70 ⇑
65-60 ⇓
845.4
|
|
65-60 ⇑
79-70 ⇓
846.28
|
79-70
846.5
G847
|
79-70
Crossover
846.8
G847
/
|
79-70
Where the Pocatello sub joins the Evanston sub
847
\
79-70
Siding length: 13,456'
847.23
79-70
849.9
79-70 ⇑
70-60 ⇓
850.2
70-60 ⇑
79-70 ⇓
853.1
⋁
79-70
Center siding length: 6,040'
853.3
|
79-70
Hot Box & Dragging Equipment. Talk on defect only.
854.4
⋀
79-70
Center siding length: 6,040'
859.8
G860
79-70
860.1
79-70 ⇑
65-60 ⇓
862.5
65-60 ⇑
79-70 ⇓
863.7
G684
79-70
Westbound Hold Signal
865.94
79-70
⋁
|
79-70
Center siding length: 1,913'
866.5
⋀
79-70
Center siding length: 1,913'
866.7
79-70 ⇑
65-60 ⇓
867.7
65-60
Hot Box & Dragging Equipment. Talk on defect only.
874.3
⋁
65-60
Center siding length: 6,522'
874.5
|
|
65-60 ⇑
79-70 ⇓
875.5
|
79-70
875.7
|
79-70
280' Accessed from the West via main 1.
875.7
G876
⋀
79-70
Center siding length: 6,522'.
876.3
G876
79-70
878.2
79-70 ⇑
65-60 ⇓
880.1
65-60 ⇑
55-50 ⇓
880.6
55-50
884.1
55-50
Hot Box & Dragging Equipment. Talk on defect only.
885
⇑ 55-50
⇓ 65-60
Speed change!
885.1
65-60
6,378' Center Siding.
886.4
65-60
6,378' Center Siding.
889
G889
65-60
Eastbound Hold Signal
889.3
G890
65-60
Westbound Hold Signal
890.46
65-60
890.5
65-60
1,079' Center Siding.
890.5
65-60
Hot Box & Dragging Equipment. Talking detector.
890.9
65-60
1,079' Center Siding.
892.41
65-60
895.51
65-60
896.7
65-60 ⇑
50-45 ⇓
896.9
50-45
689' Center Siding.
897.1
50-45
689' Center Siding.
900
G900
50-45
Crossover.
900.75
50-45
901.7
50-45 ⇑
45-40 ⇓
901.8
45-40
Tunnel Length 6,706'
902.1
45-40
Tunnel Length
903.6
45-40 ⇑
50-45 ⇓
903.73
50-45
904.6
G905
50-45
Crossover. 4,825' Siding on South side of the track 2.
904.9
50-45
4,825' Siding on South side of the track 2.
908.6
50-45 ⇑
65-60 ⇓
909.1
65-60
Hot Box & Dragging Equipment. Talk on defect only.
910.6
65-60
Hot Box & Dragging Equipment. Talking detector.
911.21
65-60
912.2
65-60
1,501' Center Siding.
912.48
65-60
912.7
65-60
1,501' Center Siding.
913.89
65-60
915.6
65-60 ⇑
50-45 ⇓
915.8
G915
50-45
Westbound Hold Signal.
916.1
50-45
Crossover. 9,088' Siding on North side of tracks
916.21
50-45
916.96
50-45
917.15
50-45
917.2
50-45
917.3
50-45
8,979' Siding on the South side of the tracks.
917.9
50-45
9,088' Siding on the North side of the tracks.
919.1
50-45 ⇑
55-50 ⇓
8,979' Siding on the South side of the tracks.
919.2
G919
55-50
Eastbound Hold Signal.
920.44
55-50
922.8
55-50
923.26
55-50
924.28
55-50
925.6
55-50
Hot Box & Dragging Equipment. Talk on defect only.
926.5
55-50 ⇑
M1 40-35 ⇓
M2 50-45
4,662' Center Siding.
927.6
M1 40-35
M2 50-45
4,662' Center Siding.
927.61
M1 40-35
M2 50-45
927.62
M1 40-35
M2 50-45
820' Accessed from the East via main 2.
928.3
M1 40-35
M2 50-45
Westbound Hold Signal.
928.8
M1 40-35 ⇑
M2 50-45
M1 30-30 ⇓
M2 50-45
930.1
M1 30-30
M2 50-45
Tunnel Length 1,107'
930.5
M1 30-30
M2 50-45
931.1
M1 30-30
M2 50-45
Tunnel Length 1,223'
931.3
M1 30-30
M2 50-45
Tunnel Length 692'
931.46
M1 30-30
M2 50-45
931.48
M1 30-30
M2 50-45
935.5
M1 30-30
M2 50-45
Tunnel Length 201'
M1 30-30 ⇑
M2 50-45
M1 45-40 ⇓
M2 50-45
936.2
G936
M1 45-40
M2 50-45
Eastbound Hold Signal.
936.3
M1 45-40
M2 50-45
936.3
M1 45-40
M2 50-45
Hot Box & Dragging Equipment. Talk on defect only.
939.4
M1 45-40 ⇑
M2 50-45
50-45 ⇓
940.69
50-45
941.02
50-45
941.41
50-45
941.6
50-45 ⇑
M1 50-45 ⇓
M2 45-40
942.3
G942
M1 50-45
M2 45-40
Westbound Hold Signal.
942.4
M1 50-45
M2 45-40
5,665' Center Siding.
942.8
M1 50-45
M2 45-40
590' Accessed from the East via main 2.
M1 50-45 ⇑
M2 45-40
45-40 ⇓
943.6
45-40
5,665' Center Siding.
943.78
45-40
945.15
45-40
947.9
45-40
951.2
45-40 ⇑
M1 45-40 ⇓
M2 35-35
951.7
M1 45-40 ⇑
M2 35-35
35-35 ⇓
951.81
35-35
952.2
G952
35-35
Eastbound Hold Signal.
952.5
35-35 ⇑
50-45 ⇓
389' Accessed from the East via main 2.
952.67
50-45
952.6
50-45
6,628' Center Siding.
953.4
50-45
954
50-45
6,628' Center Siding.
954.5
50-45 ⇑
55-50 ⇓
Speed change!
955.1
55-50
Hot Box & Dragging Equipment. Talk on defect only.
956.33
55-50
957.1
55-50
958.11
55-50
958.6
55-50
Hot Box & Dragging Equipment. Talk on defect only.
960.45
55-50
960.5
55-50
5,791' Center Siding.
960.8
55-50
1,354' Accessed from the West via main 1.
961.6
55-50
5,791' Center Siding.
961.6
G962
55-50
Westbound Hold Signal.
962.12
55-50
963.03
55-50
963.1
55-50 ⇑
35-30 ⇓
963.2
35-30
Tunnel Length 538'
964
35-30
Tunnel Length 322'
965.1
35-30 ⇑
55-50 ⇓
965.2
55-50
Eastbound Hold Signal.
965.44
55-50
967.73
55-50
967.8
55-50
927'
968
55-50
6,285' Center Siding.
968.3
55-50
968.8
55-50
Hot Box & Dragging Equipment. Talk on defect only.
969.04
55-50
969.36
55-50
969.4
55-50
6,285' Center Siding.
969.61
55-50
969.68
55-50
969.8
55-50
970.66
55-50
971.19
55-50
971.73
55-50
972.62
55-50
973.22
55-50
973.44
55-50
973.73
55-50
974.06
55-50
862.5
55-50 ⇑
45-40 ⇓
974.4
45-40
975.15
45-40
975.4
45-40
Center Siding removed. Before being removed it was 5,494'
975.5
G975
45-40
Westbound Hold Signal.
976.52
45-40
977.02
45-40
977.48
45-40
977.7
G978
45-40
Crossover
978.13
45-40
978.7
45-40 ⇑
35-30 ⇓
979.25
35-30
980.1
35-30
980.3
35-30 ⇑
40-35 ⇓
980.79
40-35
981
40-35 ⇑
M1 45-40 ⇓
M2 40-35
982.1
M1 45-40
M2 40-35
Tunnel Length 250'
983.5
M1 45-40 ⇑
M2 40-35
M1 50-45 ⇓
M2 40-35
983.8
M1 50-45 ⇑
M2 40-35
50-45 ⇓
984.19
50-45
984.3
50-45
984.7
50-45
985.03
50-45
985.38
50-45
985.44
50-45
985.89
50-45
986.03
50-45
986.2
55-50
Hot Box & Dragging Equipment. Talk on defect only.
986.95
50-45
987.85
50-45
988.5
C988
50-45
Crossover
988.65
50-45
988.7
50-45 ⇑
40-40 ⇓
988.7
40-40
Main 3 starts here and is a bypass track to the Salt Lake sub.
862.5
40-40 ⇑
30-30 ⇓
989.85
40-40
989.93
40-40
989.6
C990
40-40
Crossover
991.05
40-40
991.3
40-40
991.4
C992
40-40
Crossover
991.8
40-40
528' Accessed from the East via main 2.
992.56
40-40
992.6
40-40
992.8
40-40
792' Accessed from the West via main 1.
993.23
40-40
993.3
40-40
© 2015, Spencer Peterson.